Coated Steel Pipes

Forever Steel Manufacturing Co., Ltd
Coated steel pipe,3LPE coated pipe,FBE coated steel pipe

Latest news list

  • Bitumen coated pipe,Austenitic stainless steel,Production tubing
    You need custom curves for a specific project,but bending steel often results in wrinkles or cracks,It is frustrating when a simple modification ruins high-quality steel,I will show you how to get the perfect angle,To learn how to bend exhaust pipe effectively,you must support the internal structure to prevent collapse,For manual bending
  • Electric resistance welded,3LPP coated pipe,Polyethylene coated pipe
    Natural gas is a highly flammable and explosive energy source,and its safe transportation is a matter of great importance,Among all transportation methods,long-distance pipelines are considered the safest,fastest,and most cost-effective solution,However,during the operation of these pipelines
  • Structural hollow section,Precision seamless pipe,Drill pipe
    In modern construction and residential water supply systems,PE coated pipe has become one of the most reliable and widely used materials,Known for its corrosion resistance,durability,and flexibility,it provides a practical solution for both hot and cold water pipelines,Below,we explore the operating conditions,installation considerations,and technical performance of PE coated pipes in building applications,

Coated Steel Pipes

High-Performance Coated Steel Pipes – Advanced Anti-Corrosion Solutions

As an industry-leading manufacturer, FOREVER STEEL provides high-integrity Coated Steel Pipes engineered to withstand the most aggressive soil and marine environments. By integrating premium base pipes (SMLS, LSAW, ERW, SSAW) with state-of-the-art coating technologies, we ensure a service life exceeding 30–50 years for critical global infrastructure.

Technical Specifications & Dimension Range

Our coating facility handles a wide spectrum of pipe dimensions to meet diverse project scales:

Outside Diameter (O.D.): 2"–120" (60.3mm–3048mm)

Wall Thickness (W.T.): 3mm–60mm

Base Pipe Options: Seamless (SMLS), Longitudinal Welded (ERW/LSAW), Spiral Welded (SSAW).

Length: Single pipe up to 12.5 meters (Custom lengths available for specialized piling or transmission).

Advanced Coating Systems & Protection Standards

We offer multi-layer protection systems compliant with the most stringent international anti-corrosion standards:

External Coatings:

3PE (3-Layer Polyethylene): Compliant with DIN 30670, CAN/CSA Z245.21.

FBE (Fusion Bonded Epoxy): Single or Dual Layer, compliant with AWWA C213, API RP 5L7.

3PP (3-Layer Polypropylene): Ideal for high-temperature environments, compliant with DIN 30678.

Coal Tar Enamel/Epoxy: Compliant with AWWA C203/C210.


Internal Linings:

Liquid Epoxy: Reduces friction and enhances flow efficiency (API RP 2L).

Cement Mortar Lining (CML): Compliant with AWWA C205, ideal for water utilities.

Material Compliance & Global Standards

All base pipes and coating materials are strictly sourced and processed under ISO 9001 quality management:

Steel Grades: API 5L Grade B, X42, X46, X52, X56, X60, X65, X70, X80; ASTM A53; ASTM A106; EN 10219 (S355J2H).

Manufacturing Standards: API 5L (PSL1/PSL2), ASTM A252, AWWA C200, AS/NZS 1579.

Professional End Preparation

To ensure superior weld integrity and coating continuity during field jointing:

Cut-Back Area: Standard 100mm–150mm uncoated ends (customizable) for ease of on-site welding.

Bevelled Ends: Precisely machined to 30°(+5°/-0°) per ANSI B16.25, protected by temporary anti-rust varnish or tape.

End Protection: Heavy-duty plastic caps or steel rings to prevent internal contamination and bevel damage.

Critical Industry Applications

Our coated solutions are the benchmark for durability in:

Energy Infrastructure: Long-distance oil, gas, and jet fuel transmission pipelines.

Water Management: Desalination plants, municipal water supply, and high-pressure sewage systems.

Marine & Piling: Offshore piling, bridge foundations, and harbor construction in high-salinity environments.

Quality Assurance & Technical Documentation

Holistic Testing: 100% Spark Leakage (Holiday) Testing, Adhesion (Peel) Tests, Impact Resistance, and Coating Thickness Verification.

Traceability: Mill Test Certificates (MTC) issued according to EN 10204 3.1.

Project Compliance: Full provision of ITP (Inspection and Test Plan) and MPS (Manufacturing Procedure Specification) for international tenders.

Export Packaging & Logistics Strategy

We prioritize the integrity of the coating layer during international transit:

Handling: Strict use of nylon lifting slings and rubber-padded hooks to prevent coating scarring.

Packaging: Padded bundling for small pipes; large diameter pipes use specialized rubber separators and timber dunnage to avoid steel-on-steel contact.

Shipping: Expert sea-worthy lashing in containers or bulk vessels; Third-Party Inspection (SGS/BV) is mandatory before shipment to ensure "Zero-Defect" delivery.

Find what you need ?

close