Offshore Wind Farm

Forever Steel Manufacturing Co., Ltd
Longitudinal welded pipe,Fusion bonded epoxy coating,Coated steel pipe

Bac Lieu Offshore Wind Farm (Phase III)

Bac Lieu Offshore Wind Farm (Phase III),304 stainless steel pipe,Tubing pipe,Welded steel pipe

Project Name: Bac Lieu Offshore Wind Farm (Phase III)

Location: Vietnam (Mekong Delta Region)

Product: Large Diameter LSAW Steel Piling Pipes

Material: EN 10219 S355JR / ASTM A252 Grade 3

Specification: OD 1200mm - 2500mm (WT 20mm - 50mm), Length up to 60mtr

Quantity: 4,500 Tons

Year: August 2021

Description: Supply of massive structural steel piles for offshore turbine foundations. Given the soft seabed conditions in the Mekong Delta, the pipes required high dimensional accuracy and Heavy-Duty C5-M Marine Grade Anti-Corrosive Coating to withstand the high-salinity and high-humidity environment.

Find what you need ?

close