Geothermal Power Project

Forever Steel Manufacturing Co., Ltd
LSAW steel pipe,OCTG,Carbon steel seamless pipe

Al Khaleej Combined Cycle Power Plant (Phase II)

Al Khaleej Combined Cycle Power Plant (Phase II),Steel pipe fittings,Black welded pipe,Pipe fittings

Project Name: Al Khaleej Combined Cycle Power Plant (Phase II)

Location: Dammam, Saudi Arabia

Product: High-Pressure Seamless Alloy Steel Pipes

Material: ASTM A335 P11/P22/P91

Specification: OD 219mm - 711.2mm (WT 12mm - 50mm)

Quantity: 1,200 Tons

Year: August 2018

Description: Supply of chrome-moly alloy pipes for high-temperature steam headers and critical power piping systems, featuring full MTC 3.2 certification and 100% Ultrasonic Testing (UT).

Find what you need ?

close